Wednesday, March 24, 2010

Careers in Architecture

Careers:
  1. Beginning Drafter: Entry level position to gain experience and skill
  2. Experienced Drafter: Expected to make construction decisions based on initial designs
  3. Positions are available with architects engineers and designers
  • Designer: May work under and architect and as a coordinator of many drafters
  • Architect: Must be liscensed to practice
  1. designs residential and commercial buildings
  2. additional schooling beyong highschool required
  • Engineer: Work is more technical and requires high level of math and science
  • Building Inspector: Check plans to ensure codes and laws have been followed

Engineering Design Process

Elements of the Design Process:
  • Problem Identification
  • Research phase
  • Requirements Specification
  • Concept Generation
  • Design Phase
  • Prototyping Phase
  • System Integration
  • Maintenance Phase

Steps to the Problem:

  • Collect information
  • Interpret information
  • Organize needs hierarchy
  • Determine relative importance of needs
  • Review outcomes and process

Requirement Specifications:

Identifies requirements design must satisfy for success

  • Marketing Requirements (Custom Needs)
  • Engineering Requirements ( Applies to technical aspects , Performance Requirements)

Example Engineering Requirements:

  • Performance and Functionality
  • Reliability
  • Energy

Tuesday, March 23, 2010

Bubble House Plan


House Plan Summary

The house plan I have chosen to do is 1810 square Ft. This fits perfectly within the requirements that we were given for this assignment. The first floor of my house has 3 bedrooms and 2 baths. All of the bedrooms are attached by a single hallway, making all the bedrooms easy to access. In all of the bedrooms there are huge closets, making a lot of storage for the family. When you walk into the house you are able to see the dining room, kitchen and living room all as one. The whole front of the house is following an open concept. This makes the house appear bigger, and everyone can see everything in the house. Behind the kitchen is a dining room and then off of the dining room is the laundry room. The laundry room is then attached to the garage at the back of the house. This makes it more convenient for the family because the utility room can also be used for shoe storage etc. The living room is a nice place for the family to spend time together with a tv and the computer all in the same room.

House Plans










Monday, March 22, 2010

Week 7

Monday - First day back to school after the march break. Uploaded my roller coaster animation to the blog and then started to look at our next project , Making a house

Tuesday- Started to work on our house projects. Found two different house plans and combined them to make my own to fill the requirments of the project. I made a bubble diagram and posted it to my blog

Wednesday- Started to do the floor plan for my house with the correct measurements. Made a note on different architectural careers.

Thursday- Continued to work on the floor plan added doors and windows.









Tuesday, March 9, 2010

Week 6

Monday - Contiued to work on the roller coaster assignment and started to work on animating it. Tommorrow will be a contiuation of the animation

Tuesday - Contiued to work on roller coaster animation

Wednesday- Finished the roller coaster animation and started to add trees etc in.

Thursday - Finished adding everything in.

Friday - Was not present . Start of march break